Public Checkpoint Revision Limitations

schedule_revision in the current release line is designed to be truthful and auditable with public-style data, not to simulate a continuous intraday desk.

What it does model

  • a baseline D-1 schedule
  • explicit local revision checkpoints
  • locked commitments for current and past intervals
  • forecast-aware re-optimization of the future unlocked horizon
  • reserve headroom preservation when the base workflow is da_plus_fcr
  • locked Belgium aFRR commitments with energy-only reshaping around them
  • reconciliation against frozen or public realized inputs

What it does not model

  • continuous limit-order-book trading
  • queue position, partial fills, or execution slippage
  • day-ahead re-nomination after gate closure
  • reserve re-award, FCR re-nomination, or aFRR re-award
  • operator qualification logic
  • production settlement statements

Why this matters

Checkpoint revision is intentionally narrower than a live trading system. The goal is to answer:

  • did later public information justify changing the future plan?
  • how much value was blocked by locked commitments?
  • how different was realized PnL from the baseline and revised expectations?

That makes schedule_revision useful for:

  • operational decision-support experiments
  • revision-policy benchmarking
  • forecast-value studies
  • schedule audit trails

It does not make the repo a live intraday execution engine.